Data centres
How to market a data centre with an offering memorandum
A data centre (data center in the US) is bought on power, cooling and connectivity. Floor area matters less than critical IT load and how the power is backed up.
How to market it
- Lead with critical IT load and the utility supply: how many feeds, and the capacity the utility or the seller documents.
- Describe backup power and cooling with the redundancy level the seller documents, for example N+1.
- List the carriers on site and the meet-me room. Connectivity is one of the reasons tenants stay.
- For a leased facility, put the tenant, the term and how power costs are passed through next to the rent.
Sections the document needs
Cover and executive summary
Critical IT load, tenancy, price or rent on one page.
Power
Utility feeds, critical IT load and any expansion capacity, as documented.
Backup power and cooling
Generators, UPS and cooling, with their redundancy level.
White space
Raised floor or data hall area and layout.
Connectivity
Carriers on site and the meet-me room.
Security and certifications
Only what the seller can document.
Tenancy and leases
Tenants, terms and power pass-through.
Operating statement and NOI
For an income property, as reported.
Offering process and confidentiality
Confidentiality agreement first, then the data room.
Start with your property address
Type the address to open a new document for a data centre listing. You confirm the address and add your facts in the next steps.
Have a fact sheet? Upload it insteadWhat OfferingStack asks for and prints
- Pick Other, then Data centre. The property details offer fields for critical IT load, utility power, backup power, cooling, raised floor, connectivity and security.
- Figures print as you typed them; nothing about power or cooling is filled in for you.
Samples, templates and pricing
- Sample pages from fictitious listings
- Offering memorandum template
- Pricing and monthly plans
- Tenant profiles and covenant strength in an OM
- Confidentiality agreements and the offering process
- Data rooms and deal rooms for CRE listings
- What buyers ask for: data centre sale checklist
- All due diligence checklists
Other property types: Land · Seniors housing · Manufactured housing · Parking · Hotel · Self-storage · Sublease
Guides, calculators and AI tools
Guides
Free calculators
Common questions
- What should a data centre OM lead with?
- Critical IT load, the utility supply and the backup power and cooling, then connectivity and tenancy.
- What if my listing does not have every section?
- A page prints only when the listing has the information for it, so a short listing makes a shorter document instead of empty pages.
- Can I see a draft before I pay?
- Yes. Every account can make one watermarked preview of its own listing and review the pages before buying anything.
See your own listing as a finished document.
Upload your fact sheet or rent roll and review a watermarked preview of your pages before you buy anything.